Commercial & industrial concrete coatings · Maine and New Hampshire
213 Route 236, Berwick, ME Mon–Fri 8:30am–6:00pm (207) 351-6220
Epoxy Pros of New England
Hanger - 15,000 sq ft of white epoxy with aliphatic urethane top coat at Sanford Seacoast Regional Airport Epoxy Flooring-min

Brewery, distillery & taproom floor coatings

Brewhouse, cellar, canning line and taproom — four rooms with four different problems, on one slab. Wet floors that have to be safe to walk on, acid that comes off the product, and a schedule measured in the gap between brews.

Installed between brewsAround your production calendar
Slip rated when wetWhere the crew actually walks
Acid resistantLactic, acetic, caustic CIP
Coved and falls to drainCleans down properly
What actually goes wrong

A brewery floor is wet, acidic and walked on all day.

Wort, beer and cleaning chemistry all attack a floor that was specified for a warehouse. The cellar stays wet, the brewhouse sees hot liquor and steam, and the canning line collects sugar that goes sour. Meanwhile the taproom floor has to look like somewhere people want to drink. The failure is usually the same one: a single system laid across every room, chosen for the easiest of them.

Where we will tell you something else

  • Small taprooms where a polished or sealed slab genuinely serves better
  • Fit-outs where the drainage has not been designed yet — floor comes after
  • Buildings where the brew schedule leaves no window long enough to cure
  • Historic slabs that need structural assessment before anything is laid
  • Anyone expecting one system to serve the cellar and the taproom equally
Specification

What gets installed, and what it is rated for.

Typical systemUrethane cement in production areas; quartz broadcast or decorative flake front of house
Build thickness1/4″ in the brewhouse and cellar, 20–30 mils in taproom and dry areas
Surface preparationDiamond grinding or shot blasting to CSP 3–5, with termination details at drains and thresholds
Chemical resistanceLactic and acetic acid, wort and sugars, caustic and acid CIP chemistry, sanitiser
Slip resistanceGraded by room — heavy texture in the cellar and brewhouse, lighter on the taproom side
Thermal shockUrethane cement handles hot liquor spill and steam cleaning without debonding
Return to serviceFoot traffic 8–12 hrs · washdown and production 48–72 hrs
CovingIntegral coved base at walls and plinths, formed with the floor, falling to trench or point drains
WarrantyWritten workmanship warranty, terms by system
The part that decides the job

How we keep you running while we work.

Every commercial proposal we issue includes a phasing plan and the hours each zone is out of service. If we cannot make the window work, we will tell you at the walk-through rather than halfway through the install.

Stage 01

Work to the brew calendar

We plan around your production schedule and pick the window that costs you the fewest batches.

Your calendar, not ours
Stage 02

Room by room

Cellar, brewhouse, packaging and taproom taken in sequence so the business keeps trading.

One room at a time
Stage 03

Install off-hours

Overnight and between services. Tanks and lines protected, dust contained, no product exposure.

Nights & closed days
Stage 04

Wash down and hand back

Floor washed with your own chemistry before the room goes back into use.

Before you brew on it
Common questions

What facility managers ask us first.

Can you do this without stopping production?
Almost always. We work room by room, overnight and on closed days, and we plan the sequence around your brew and packaging calendar rather than ours. The cellar is usually the one that needs the longest window, so that is the conversation to have first.
Do we need the same floor throughout?
No, and you should not want one. The cellar and brewhouse need urethane cement with heavy slip texture. The taproom needs something cleanable and presentable that people are not going to skid on when it is wet at the bar. Specifying one system across both means overpaying front of house and underspecifying at the back.
What about the trench drains?
Detailed as part of the floor. Falls are set so water actually reaches the drain rather than sitting in the low spot next to it, and the floor is terminated into the drain body rather than butted up against it. A brewery floor that ponds is a slip claim waiting to happen.
Will it handle caustic CIP?
Yes. Urethane cement is specified for exactly this: caustic and acid cleaning chemistry, hot water, and the lactic and acetic acid that comes off the product. Tell us the chemistry and concentrations at the walk-through and we will confirm the grade.
Next step

Walk the building with us.

An hour on site gets you a moisture reading, an honest assessment of the slab and the joints, a system recommendation, and a phasing plan that fits your operation. No obligation, and no pressure to decide on the spot.

Speak to us directly(207) 351-6220
Mon–Fri 8:30am–6:00pm · peter@epoxyprosofnewengland.com

Tell us about the facility

We reply the same working day wherever we can.

We do not pass your details to anyone, and the owner runs the assessments personally.

Scroll to Top