Commercial & industrial concrete coatings · Maine and New Hampshire
213 Route 236, Berwick, ME Mon–Fri 8:30am–6:00pm (207) 351-6220
Epoxy Pros of New England
Commercial Chocolatier kitchen in Dover, NH by Epoxy Pros of New England-min

Commercial kitchen floor coatings

A kitchen floor has to be safe underfoot when it is wet with oil, survive a hot washdown every night, and pass inspection. Quarry tile does two of the three until the grout goes. We install seamless systems overnight, between services.

Overnight installsOpen for the next service
Seamless and covedNo grout lines to fail
Slip rated when greasyGraded to the station
Hot washdown safeUrethane cement
What actually goes wrong

It is almost never the tile. It is the grout.

Quarry tile in a commercial kitchen fails at the joints: grout erodes under hot water and degreaser, the bed beneath it stays wet, and tiles start to lift and rock. What follows is a floor that cannot be cleaned properly, a trip hazard at every loose tile, and a health inspection finding. A seamless urethane cement floor has no joints to erode, coves up the wall so there is no edge to trap grease, and falls to drain. It also goes down overnight.

Where we will tell you something else

  • Dining rooms and front of house, where this is the wrong material entirely
  • Kitchens where the drainage or the fall needs rebuilding first
  • Sound tile that only needs regrouting — we will tell you that
  • Sites with no realistic overnight window and no closed day
Specification

What gets installed, and what it is rated for.

Typical systemUrethane cement with integral coved base, sealed to a slip-graded finish
Build thickness1/4″ over the cook line and dish pit; lighter in dry prep
Surface preparationExisting tile and bed removed to sound concrete, then shot blasted to CSP 4–6
Slip resistanceAggregate graded by station — heaviest at the fryer and dish pit, lighter in dry prep
Chemical resistanceAnimal fats and cooking oils, degreaser, sanitiser, vinegar and citrus acids
ComplianceSeamless, cleanable and coved, specified to support health inspection requirements
Return to serviceFoot traffic 8–12 hrs · full washdown 48–72 hrs
WarrantyWritten workmanship warranty, terms by system
The part that decides the job

How we keep you running while we work.

Every commercial proposal we issue includes a phasing plan and the hours each zone is out of service. If we cannot make the window work, we will tell you at the walk-through rather than halfway through the install.

Stage 01

Walk it after service

We look at the floor when the kitchen is running, not when it is empty — that is when you can see where the water goes.

While you are trading
Stage 02

Strip overnight

Tile and bed out, slab prepared, all in one closed period with the equipment protected.

One night
Stage 03

Lay and cove

Seamless floor laid to falls with the coved base formed in the same pour.

No joints
Stage 04

Back for service

Foot traffic the same morning; full washdown once the system has cured.

Open on time
Reference installation

A recent job in this sector.

Commercial Chocolatier kitchen in Dover, NH by Epoxy Pros of New England-min

Commercial Kitchen Flooring, Chocolatier, Dover, NH

Installed a commercial-grade epoxy flooring system throughout the chocolatier kitchen.

Commercial kitchen epoxy flooringSystem
Dover, NHLocation
See this project →
Common questions

What facility managers ask us first.

Can you do it in one night?
A single room or a cook line, usually yes — strip, prepare and lay in one closed period, with foot traffic the next morning. A whole kitchen with tile to remove and drains to detail is more honestly two or three nights, and we would rather tell you that at the walk-through than halfway through.
Is it slippery when it is greasy?
Not if it is graded properly. We set the aggregate by station — heaviest at the fryer and the dish pit where oil and water end up, lighter in dry prep where a heavy texture would just be hard to clean. A single texture across the whole kitchen is how you get a floor that is either dangerous or unmoppable.
Will it pass a health inspection?
The floor is seamless, coved up the wall, and falls to drain, which is what an inspector is looking for in a floor. They are assessing the whole kitchen, so nobody can promise you the result — but this takes the floor off the list.
Our tile is only cracked in a few places.
Then it may not be time yet. If the bed underneath is sound and the grout is holding, patching is the cheaper and correct answer, and we will say so. It is when the tiles start rocking that the bed is wet and patching stops being worth doing.
Next step

Walk the building with us.

An hour on site gets you a moisture reading, an honest assessment of the slab and the joints, a system recommendation, and a phasing plan that fits your operation. No obligation, and no pressure to decide on the spot.

Speak to us directly(207) 351-6220
Mon–Fri 8:30am–6:00pm · peter@epoxyprosofnewengland.com

Tell us about the facility

We reply the same working day wherever we can.

We do not pass your details to anyone, and the owner runs the assessments personally.

Scroll to Top