Concrete grinding & surface preparation
The step that decides whether a coating lasts ten years or peels in two — offered on its own.
What grinding & surface prep actually is.
Diamond grinding or shot blasting to a measured concrete surface profile, with failed coatings, adhesive and contamination removed. Every system on this site depends on it, and nearly every failure we are called in to replace skipped it. We also do it as standalone work for other trades.
Where we are the right call
- Slabs being prepared for any coating or polished finish
- Removal of failed coatings, adhesive or mastic
- Other trades who need a substrate prepared properly
- Occupied buildings needing dust-controlled preparation
Where we will tell you something else
- Slabs needing structural repair, which comes before any grinding
- Floors where the tile may contain asbestos — abatement by others first
What it is rated for.
| Profile | CSP 2–5 depending on the system going over it. Measured, not estimated |
|---|---|
| Method | Diamond grinding or shot blasting. Never acid etching — it does not produce a mechanical profile |
| Dust control | HEPA extraction on every machine, with containment and negative air in occupied buildings |
| Coating removal | Failed epoxy, urethane, paint, tile adhesive and mastic taken back to sound concrete |
| Moisture testing | Slab tested and recorded as part of preparation, before anything is specified |
| Warranty | Written workmanship warranty, terms by system |
Four stages, and you know when you get the space back.
Site assessment
We walk the building, test the slab for moisture and dew point, review chemical exposure and agree the shutdown window. You get a written scope, not a number on a card.
On site, no obligationPreparation
Diamond grinding or shot blasting to profile, crack and joint repair, and HEPA extraction so the rest of the building stays open.
Dust contained · CSP 2–3Installation
Base coat, broadcast and topcoat, phased by bay or zone. Overnight and weekend work where production cannot stop.
Phased by zoneReturn to service
Foot traffic the following morning, vehicles and racking the day after. Cold slabs cure slower and we tell you the real number.
10–14 hrs foot · 24–48 hrs loadWhat people ask about this system.
Why not acid etching?
Will it make a mess of the building?
How much of my building has to stop?
How quickly can we use the floor again?
Do you work nights, weekends and shutdowns?
Can you install in winter?
The last coating failed. Why would this be different?
What does a site assessment involve?
Book a site assessment.
We walk the building, test the slab, and put a written scope and a realistic shutdown plan in front of you. No obligation, and if the timing or the system is wrong for your space we will say so.
