
Full broadcast flake epoxy flooring
Service bays, workshops, corridors, showrooms and garages that need a hard-wearing seamless surface.
What full broadcast flake actually is.
Vinyl flake broadcast to refusal into a wet base coat, scraped back and sealed. "Full broadcast" is the distinction that matters: the flake covers the whole surface rather than being scattered over it, which is what gives the floor its texture, hides slab imperfections, and makes it repairable in place.
Where we are the right call
- Garages, basements, workshops and service bays
- Corridors and back-of-house areas that need texture underfoot
- Slabs with cosmetic patching that a solid colour would highlight
- Floors that may need spot repair later rather than full replacement
Where we will tell you something else
- Food production areas, which need urethane cement
- Heavy forklift and impact zones needing an epoxy mortar build
- Spaces wanting the poured movement of a metallic finish
- Wet processing floors where a heavier quartz build serves better
What it is rated for.
| Build thickness | 20–30 mils |
|---|---|
| Surface preparation | Diamond grinding to CSP 2–3 |
| Return to service | Foot traffic 10–14 hrs · vehicles 24–48 hrs |
| Slip resistance | Texture comes from the flake itself; grading adjusted by area |
| Appearance | Blend chosen from sample; hides slab patching and colour variation |
| Repairability | Damaged areas can be re-broadcast and blended rather than replaced wholesale |
| Warranty | Written workmanship warranty, terms by system |
Four stages, and you know when you get the space back.
Site assessment
We walk the building, test the slab for moisture and dew point, review chemical exposure and agree the shutdown window. You get a written scope, not a number on a card.
On site, no obligationPreparation
Diamond grinding or shot blasting to profile, crack and joint repair, and HEPA extraction so the rest of the building stays open.
Dust contained · CSP 2–3Installation
Base coat, broadcast and topcoat, phased by bay or zone. Overnight and weekend work where production cannot stop.
Phased by zoneReturn to service
Foot traffic the following morning, vehicles and racking the day after. Cold slabs cure slower and we tell you the real number.
10–14 hrs foot · 24–48 hrs loadFloors we have installed in full broadcast flake.

Polar Flake Floor Coating, Wells, ME

Eagle Flake Shop Floor, Paris, ME

Comet Flake Garage Floor, Biddeford, ME

Two-Color Flake Hangar Floor, North Hampton, NH
What people ask about this system.
What is the difference from a partial broadcast?
Will it hide the cracks in my slab?
How much of my building has to stop?
How quickly can we use the floor again?
Do you work nights, weekends and shutdowns?
Can you install in winter?
The last coating failed. Why would this be different?
What does a site assessment involve?
Book a site assessment.
We walk the building, test the slab, and put a written scope and a realistic shutdown plan in front of you. No obligation, and if the timing or the system is wrong for your space we will say so.
