Concrete repair & resurfacing
Spalling, pitting, joint failure and salt damage put right before a coating goes near it.
What repair & resurfacing actually is.
Structural and cosmetic repair to concrete that has broken down — spalled surfaces, failed joints, cracks, and the salt damage that is endemic on a New England slab. Sometimes it is preparation for a coating. Sometimes it is the whole job, and we will tell you which.
Where we are the right call
- Slabs with spalling, pitting or surface breakdown from de-icing salt
- Failed joints in warehouse and industrial floors
- Repair ahead of a coating, a polish or a racking installation
- Owners deciding between repair and replacement, who want a straight answer
Where we will tell you something else
- Structural failure, which needs an engineer before a contractor
- Slabs so far gone that replacement is genuinely the cheaper answer
- Active water ingress, which is a drainage problem first
What it is rated for.
| Spall repair | Broken concrete cut out to sound material and rebuilt with a polymer-modified repair mortar |
|---|---|
| Joint repair | Saw-cut, cleaned and filled with semi-rigid filler, so the joint carries wheel loads instead of spalling outward |
| Crack repair | Routed and filled. Moving and structural cracks identified and flagged rather than covered |
| Salt damage | Chloride-damaged surfaces removed to sound concrete before anything is laid over them |
| Moisture remediation | Vapour barrier primers where readings require them; drainage problems referred rather than coated over |
| Warranty | Written workmanship warranty, terms by system |
Four stages, and you know when you get the space back.
Site assessment
We walk the building, test the slab for moisture and dew point, review chemical exposure and agree the shutdown window. You get a written scope, not a number on a card.
On site, no obligationPreparation
Diamond grinding or shot blasting to profile, crack and joint repair, and HEPA extraction so the rest of the building stays open.
Dust contained · CSP 2–3Installation
Base coat, broadcast and topcoat, phased by bay or zone. Overnight and weekend work where production cannot stop.
Phased by zoneReturn to service
Foot traffic the following morning, vehicles and racking the day after. Cold slabs cure slower and we tell you the real number.
10–14 hrs foot · 24–48 hrs loadWhat people ask about this system.
Repair or replace?
Why do the joints keep failing?
How much of my building has to stop?
How quickly can we use the floor again?
Do you work nights, weekends and shutdowns?
Can you install in winter?
The last coating failed. Why would this be different?
What does a site assessment involve?
Book a site assessment.
We walk the building, test the slab, and put a written scope and a realistic shutdown plan in front of you. No obligation, and if the timing or the system is wrong for your space we will say so.
