Commercial & industrial concrete coatings · Maine and New Hampshire
213 Route 236, Berwick, ME Mon–Fri 8:30am–6:00pm (207) 351-6220
Epoxy Pros of New England
Black and White metallic floor in basement in Sanford, ME by Epoxy Pros of New England-min

Metallic epoxy flooring

Showrooms, basements, retail and feature spaces where the floor is meant to be looked at.

20–40 mils · poured · no two the sameKey specification
Ground, never etchedMeasured surface profile
Moisture testedBefore anything is specified
Documented cureReal figures, not data-sheet ones
What it is

What metallic epoxy actually is.

Metallic pigment suspended in a clear epoxy and worked while wet, so the colour moves and pools like stone or water. It is a decorative system first: the depth is the point, and no two floors come out the same, which is either the attraction or the problem depending on the client.

Where we will tell you something else

  • Wet areas, unless an anti-slip additive is specified
  • Industrial floors — this is decorative, not a traffic system
  • Anyone who needs the result to match a sample exactly
  • Slabs with significant falls or dishing, where the pour will pool
Specification

What it is rated for.

Build thickness20–40 mils
Surface preparationDiamond grinding to CSP 2–3. Slab flatness matters more here than on any other system
Return to serviceFoot traffic 24 hrs · full use 48–72 hrs
AppearancePoured and worked wet. Each floor is unique and cannot be exactly reproduced from a sample
Slip resistanceSmooth by default; anti-slip additive available where it will be walked on wet
UV stabilityNeeds a UV-stable topcoat in daylight, or the clear will amber
WarrantyWritten workmanship warranty, terms by system
How a commercial job runs

Four stages, and you know when you get the space back.

Stage 01

Site assessment

We walk the building, test the slab for moisture and dew point, review chemical exposure and agree the shutdown window. You get a written scope, not a number on a card.

On site, no obligation
Stage 02

Preparation

Diamond grinding or shot blasting to profile, crack and joint repair, and HEPA extraction so the rest of the building stays open.

Dust contained · CSP 2–3
Stage 03

Installation

Base coat, broadcast and topcoat, phased by bay or zone. Overnight and weekend work where production cannot stop.

Phased by zone
Stage 04

Return to service

Foot traffic the following morning, vehicles and racking the day after. Cold slabs cure slower and we tell you the real number.

10–14 hrs foot · 24–48 hrs load
Common questions

What people ask about this system.

Can you match the picture I have?
We can match the palette and the general character, and we will show you samples in your own light. We cannot reproduce a specific photograph — the material is poured and worked wet, and that unrepeatability is what makes it worth having. If you need an exact, repeatable finish, flake is the honest recommendation.
Is it slippery?
Smooth, by default, which is fine in a dry showroom and wrong anywhere it will be walked on wet. Where that is a risk we add an anti-slip additive to the topcoat, which costs a little of the gloss and is worth it.
How much of my building has to stop?
As little as we can engineer. Almost all of our commercial work is phased — one bay, one zone or one room at a time — so the whole facility is never down at once. We agree the sequence and the hand-back times at the walk-through and put them in the proposal, which means you can plan around a number rather than a promise.
How quickly can we use the floor again?
Foot traffic roughly 10 to 14 hours after the last coat, vehicles, racking and equipment after 24 to 48 hours, both at 70°F. A cold slab is slower and we will tell you the real figure for your building rather than the data-sheet one.
Do you work nights, weekends and shutdowns?
Yes, and on most commercial jobs that is how we prefer to run it. Off-shift work is normal scheduling for us rather than an exception we charge extra to accommodate. Holiday and summer shutdown windows are the easiest of all to plan against.
Can you install in winter?
In a heated interior, year-round — and winter is often the best time to book institutional and municipal work, because the building is quiet and our calendar is not competing with the summer rush. Polyaspartic systems install down to about 30°F with the slab 5°F above dew point. You may see −40°F claimed elsewhere in this industry; it is not supported by any manufacturer data sheet we work from.
The last coating failed. Why would this be different?
Nearly every failure we are called in to replace comes down to one of three things: the slab was acid etched or not prepared at all, nobody tested it for moisture, or the joints were coated over instead of being repaired. We grind or shot blast to a measured profile, we test and record moisture and dew point before anything goes down, and we treat joints as a separate detail.
What does a site assessment involve?
About an hour on site. We test the slab for moisture, look at the joints, the drains and the thresholds, ask what gets spilled on the floor and what cleans it, and talk through when the space can realistically be released. You get a written scope with a system recommendation and a phasing plan. There is no obligation and no pressure to decide on the spot.
Next step

Let us come and measure it.

We look at the slab, test it for moisture, and give you a real figure for your floor rather than a price per square foot over the phone. No obligation.

Speak to us directly(207) 351-6220
Mon–Fri 8:30am–6:00pm · peter@epoxyprosofnewengland.com

Tell us about the facility

We reply the same working day wherever we can.

We do not pass your details to anyone, and the owner runs the assessments personally.

Scroll to Top