Concrete staining & sealing
Colour that lasts, indoors and out, on concrete that should not look coated.
What staining & sealing actually is.
Acid or water-based stain driven into the concrete and then sealed, so the colour is in the slab rather than on it. It reads as concrete rather than as a coating, which is the point — and because there is no film to delaminate, it fails gracefully rather than by peeling.
Where we are the right call
- Patios, entries and walkways that should read as concrete
- Interior floors wanting colour without a coating film
- Slabs with character worth showing rather than hiding
Where we will tell you something else
- Heavily patched slabs — the stain will show every repair
- Floors needing chemical resistance or a wearing film
- Anyone wanting a uniform, repeatable colour
What it is rated for.
| Stain types | Acid stain for variegated, mineral colour; water-based for a wider and more predictable palette |
|---|---|
| Surface preparation | Ground and cleaned. Existing sealers and coatings removed — stain will not penetrate through them |
| Sealer | Penetrating or film-forming depending on exposure; UV-stable products outdoors |
| Return to service | Foot traffic 12–24 hrs after the final seal |
| Maintenance | Re-seal periodically, more often outdoors. The colour itself does not wear off |
| Warranty | Written workmanship warranty, terms by system |
Four stages, and you know when you get the space back.
Site assessment
We walk the building, test the slab for moisture and dew point, review chemical exposure and agree the shutdown window. You get a written scope, not a number on a card.
On site, no obligationPreparation
Diamond grinding or shot blasting to profile, crack and joint repair, and HEPA extraction so the rest of the building stays open.
Dust contained · CSP 2–3Installation
Base coat, broadcast and topcoat, phased by bay or zone. Overnight and weekend work where production cannot stop.
Phased by zoneReturn to service
Foot traffic the following morning, vehicles and racking the day after. Cold slabs cure slower and we tell you the real number.
10–14 hrs foot · 24–48 hrs loadWhat people ask about this system.
Will the colour be even?
How much of my building has to stop?
How quickly can we use the floor again?
Do you work nights, weekends and shutdowns?
Can you install in winter?
The last coating failed. Why would this be different?
What does a site assessment involve?
Let us come and measure it.
We look at the slab, test it for moisture, and give you a real figure for your floor rather than a price per square foot over the phone. No obligation.
