Urethane cement flooring for food & beverage plants

Production floors that take hot washdown, caustic cleaning and thermal shock every shift, and still have to pass inspection. These are urethane cement floors, not epoxy — and the difference is the whole job.

Urethane cementNot epoxy — the correct system
Thermal shock ratedSteam and hot washdown
Coved to the wallNo seam for bacteria to sit in
Installed around productionNights, weekends, shutdowns
What actually goes wrong

Most food plant floor failures start with the wrong system.

An epoxy floor in a production area meets 180°F washdown water on a 55°F slab and the two move at different rates. The bond fails, the sheet lifts at the drains and the joints, and within a season there is a lip a mop catches on and a void an inspector can find. Caustic cleaners and the lactic, acetic and phosphoric acids that come off the product finish what the thermal cycling started.

Urethane cement is a different material class. It expands and contracts at close to the rate of the concrete underneath it, which is why it survives thermal shock that delaminates epoxy, and it is laid thick enough to be repaired in place rather than replaced. Specified properly it is coved up the wall, falls to drain, and presents a single cleanable surface with nowhere for product to collect.

Where we will tell you something else

  • Dry storage and warehouse areas, where epoxy or polished concrete costs less and lasts as long
  • Front-of-house and office areas that will never see washdown
  • Slabs with a moisture or drainage problem that needs civil work first
  • Any job where the shutdown window will not allow the coving to cure properly
  • Plants wanting a cosmetic refresh rather than a system change — we will say so
Specification

What gets installed, and what it is rated for.

Typical systemPolyurethane cement (urethane mortar) with a coved integral base and a chemically resistant seal coat
Build thickness1/4″ to 3/8″ in production areas; heavier where thermal shock is severe
Surface preparationShot blasting to CSP 4–6, with keyed termination details cut at every perimeter and drain
Thermal shockWithstands steam and hot washdown; heavy-duty grades tolerate cyclical exposure to 250°F+
Chemical resistanceLactic, acetic, phosphoric and citric acids, animal fats, blood, sugars, brine and caustic CIP chemistry
ComplianceSpecified to meet USDA and FDA facility requirements and to support a HACCP plan. Coved base, sealed penetrations, falls to drain
Slip resistanceAggregate graded by area — heavy texture in wet processing, moderate in packing, smooth in dry storage
Return to serviceFoot traffic 8–12 hrs · full washdown and chemical exposure 48–72 hrs
Moisture toleranceTolerates higher slab moisture than epoxy, which is often why it is the only option on an older on-grade slab
WarrantyWritten workmanship warranty, terms by system
The part that decides the job

How we keep you running while we work.

Every commercial proposal we issue includes a phasing plan and the hours each zone is out of service. If we cannot make the window work, we will tell you at the walk-through rather than halfway through the install.

Stage 01

Walk the process

We map the line, the drains, the wash points and the chemistry, and agree which rooms come out and in what order.

Before we quote
Stage 02

Isolate and strip

The room is sealed off, the existing floor removed to sound concrete and the perimeter and drain details cut in.

Room by room
Stage 03

Lay and cove

Urethane cement laid to falls with the coved base formed as part of the same pour, not added afterwards.

One continuous surface
Stage 04

Wash-test and hand back

The room is washed down with your own chemistry and crew before it goes back into production.

Tested, not assumed
Common questions

What facility managers ask us first.

Why not epoxy? It is cheaper.
In a dry area it often is the right answer and we will tell you so. In a production area with hot washdown it is not: epoxy and concrete expand at different rates, and thermal shock breaks the bond. You would be buying the floor twice. The honest comparison is not epoxy against urethane cement on day one — it is against the cost of doing it again in two years, with the line down while you do.
Will it pass a USDA or third-party audit?
The floor system is specified to meet USDA and FDA facility requirements and to support your HACCP plan — seamless, cleanable, coved to the wall, falling to drain, with penetrations sealed. An audit assesses the whole facility and its records, not just the floor, so no contractor can promise you a result. What we can do is make sure the floor is not the finding.
Can you work around production?
Yes, and on a live plant that is the only way it works. We install room by room over nights, weekends and planned shutdowns, with the area sealed and under negative air so the rest of the plant keeps running. Sanitation windows and summer shutdowns are the easiest to plan against.
How is the coving done?
It is formed as part of the same pour, not applied afterwards as a separate fillet. That matters because a bonded-on cove has a seam at its base, and a seam in a washdown area is where product collects and where an inspector looks first.
Our floor is fine but the drains are failing.
Then the drains are the job. Re-coating a floor that falls to a failed drain buys nothing. We detail drains and trenches as part of the floor and will tell you at the walk-through if the drainage needs civil work before any coating is worth laying.
Next step

Walk the building with us.

An hour on site gets you a moisture reading, an honest assessment of the slab and the joints, a system recommendation, and a phasing plan that fits your operation. No obligation, and no pressure to decide on the spot.

Speak to us directly(207) 351-6220
Mon–Fri 8:30am–6:00pm · peter@epoxyprosofnewengland.com

Tell us about the facility

We reply the same working day wherever we can.

We do not pass your details to anyone, and the owner runs the assessments personally.

Scroll to Top