
Epoxy, concrete & garage floor coating in North Hampton, NH
Garage, basement and commercial floor coatings across North Hampton — ground properly, specified for this climate, and installed around the way the building is used.
What a floor in North Hampton is actually up against.
About 33 minutes from our shop on Route 236 in Berwick, which means North Hampton is a normal working day for our crews rather than a trip.
On the coast at North Hampton the problem is damp as much as cold. Salt air, a high water table and slabs that never fully dry out mean moisture testing decides the system more often than anything else does.
A job we did in North Hampton.
What we install in North Hampton.
Epoxy mortar & quartz broadcast
Heavy industrial traffic, forklifts, impact zones and wet processing areas.
Up to 1/4″ build · slip rated · repairableFull broadcast flake
Service bays, workshops, corridors, showrooms and garages that need a hard-wearing seamless surface.
20–30 mils · seamless · slip resistantPolyaspartic & polyurea
Fast turnarounds and cold-weather installs where the space cannot be out of use for long.
Installs to 30°F · rapid cure · UV stablePolished concrete
Warehouses, retail and institutional floors where there should be no coating to peel at all.
Densified · gloss levels · low maintenanceSelf-levelling overlays
Uneven, patched or previously repaired slabs that need a flat sound base before anything is coated.
Resurfaces · feather to full depthConcrete repair & resurfacing
Spalling, pitting, joint failure and salt damage put right before a coating goes anywhere near it.
Crack and joint repair · moisture remediationFour stages, and you know when you get the space back.
Site assessment
We walk the building, test the slab for moisture and dew point, review chemical exposure and agree the shutdown window. You get a written scope, not a number on a card.
On site, no obligationPreparation
Diamond grinding or shot blasting to profile, crack and joint repair, and HEPA extraction so the rest of the building stays open.
Dust contained · CSP 2–3Installation
Base coat, broadcast and topcoat, phased by bay or zone. Overnight and weekend work where production cannot stop.
Phased by zoneReturn to service
Foot traffic the following morning, vehicles and racking the day after. Cold slabs cure slower and we tell you the real number.
10–14 hrs foot · 24–48 hrs loadQuestions we get in North Hampton.
Do you actually work in North Hampton?
What does this climate do to a floor here?
How much of my building has to stop?
How quickly can we use the floor again?
Do you work nights, weekends and shutdowns?
Can you install in winter?
The last coating failed. Why would this be different?
What does a site assessment involve?
Where else we work near North Hampton.
Let us come and look at it in North Hampton.
We walk the building, test the slab, and put a written scope and a realistic shutdown plan in front of you. No obligation, and if the timing or the system is wrong for your space we will say so.
