Submarine Flake Floor and Stem Walls, South Berwick, ME
Unfinished concrete floor and stem walls with no protective coating.
The job
What was wrong, and what we did about it.
The problem
Unfinished concrete floor and stem walls with no protective coating.
What we did
Installed 800 sq ft of Submarine Flake broadcast epoxy across the floor and up the stem walls.
Project detail
The record.
| Town | South Berwick, ME |
|---|---|
| Property type | Residential garage |
| System installed | Submarine Flake broadcast, floor and stem walls |
| Area | 800 sq ft |
| Warranty | Written workmanship warranty, terms by system |
More work
All projects →Other jobs like this one.
Next step
Book a site assessment.
We walk the building, test the slab, and put a written scope and a realistic shutdown plan in front of you. No obligation, and if the timing or the system is wrong for your space we will say so.


